Disney CORE Services
Glendale, CA
Bohlin Cywinski Jackson
338,000 sqft
The Disney GC3 Phase 2A project includes two buildings and one parking structure. The 6-story North building has 237,000 SF of office space. The 94,000 SF South building consist of one below and five above-grade levels with a central plant, cafeteria and offices. The parking structure has six above and one below-grade levels with 1260 stalls.
Disney GC3 Phase 2A Grand Central Creative Campus is LEED Platinum certified.